About Nakheel

Nakheel (Nakheel PJSC) is one of Dubai's best-known master developers, and its name is tied first of all to Palm Jumeirah, the palm-shaped island built into the sea. The company is based in Dubai and is a member of Dubai Holding; on 16 March 2024 Nakheel and Meydan were incorporated into Dubai Holding by decision of the Ruler of Dubai. Nakheel states that it has about 15,000 hectares of master developments and that around 700,000 people live in its communities. These are the company's own figures and we have not independently checked them.

Nakheel builds destinations rather than single towers: it designs the land or island, delivers the infrastructure and then releases homes phase by phase. Today it presents six collections, Palm Jumeirah, Palm Jebel Ali, Dubai Islands, The World, District One and Meydan, plus 21 other projects on its site, including communities such as Al Furjan, International City, Jumeirah Park, Jumeirah Village Circle and Jumeirah Islands.

Its history has ups and downs. Work on Palm Jebel Ali began in 2002, stopped after the 2008 financial crisis and restarted in 2023 with 700 villas offered, which The National reports sold out within a year. In August 2022 the master plan for Dubai Islands, formerly Deira Islands, was unveiled: five islands over 17 square kilometres with more than 80 hotels and resorts.

Delivery can be judged with official DLD data. Under Nakheel's eight legal entities DLD lists 63 projects: 28 finished with 8,971 units, 35 still under construction with 6,200 units, and 6 cancelled registrations. That means roughly 59% of registered units have been delivered, while the active projects are still mid-way, with unit-weighted progress of about 29% and registered completion dates between 2026 and 2030. On 17 August 2026 the handover of 892 homes began at Jebel Ali Village. DLD only shows projects with an escrow account, so Nakheel's older communities are not in this list.

Who is Nakheel suited to? Buyers who want a large brand and established communities: families looking for a finished villa or townhouse in Al Furjan or Jumeirah Park, or luxury buyers weighing Palm Jumeirah and Palm Jebel Ali. The weaknesses are just as clear: the waterfront mega-projects take years and carry timing risk, and no public financial statements for the company were found in the sources checked. This page makes no promise about profit or price growth; before any purchase, check the project's exact status at DLD and speak to an adviser.

Milestones

  1. Palm Beach Towers 1–3: registered planned completion Planned Dubai Land Department — Project Status
  2. Handover of 892 homes at Jebel Ali Village begins Nakheel — Jebel Ali Village handover press release (17 Aug 2026)
  3. Nakheel and Meydan incorporated into Dubai Holding Dubai Media Office — Nakheel and Meydan incorporation (16 Mar 2024)
  4. Palm Jebel Ali relaunched, 700 villas offered The National — Palm Jebel Ali (12 Jan 2026)
  5. Government of Dubai takes over Nakheel from Dubai World Gulf News — Nakheel and Meydan under Dubai Holding (17 Mar 2024)
  6. Palm Jebel Ali paused after the financial crisis The National — Palm Jebel Ali (12 Jan 2026)
  7. Work begins on Palm Jebel Ali The National — Palm Jebel Ali (12 Jan 2026)
Company
Nakheel PJSC, Dubai-based master developer Nakheel — Who we are page
Ownership
Member of Dubai Holding; Nakheel and Meydan were incorporated into Dubai Holding by decision of the Ruler of Dubai on 16 March 2024 Dubai Media Office — Nakheel and Meydan incorporation (16 Mar 2024)
Master developments
15,000 hectares (company figure) Nakheel — Who we are page
People living in Nakheel communities
700,000 (company figure) Nakheel — Who we are page
Waterfront added to Dubai
More than 300 km of waterfront projects (the same page also states 410 km) Nakheel — Who we are page
Nakheel Collections
Six: Palm Jumeirah, Palm Jebel Ali, Dubai Islands, The World, District One, Meydan; plus 21 listed projects (Al Furjan, International City, Jumeirah Park…) Nakheel — Who we are page
Palm Jebel Ali, size
13.4 sq km, 16 fronds, 91 km of beachfront, 80 hotels planned; work began 2002, paused 2008, relaunched 2023 The National — Palm Jebel Ali (12 Jan 2026)
Palm Jebel Ali, villa launch 2023
700 villas launched in 2023, reportedly all sold within a year; Frond O (108 villas) 21.9% complete in Oct 2025, on track for late 2027 The National — Palm Jebel Ali (12 Jan 2026)
Dubai Islands
Master plan unveiled Aug 2022: five islands over 17 sq km, 80+ hotels and resorts, about 20 km of beaches Dubai Media Office — Nakheel Dubai Islands master plan (22 Aug 2022)
Projects registered with DLD
63 projects, 15,171 units under 8 DLD legal entities (35 active, 28 finished, plus 6 cancelled registrations) Dubai Land Department — Project Status
Delivered vs under construction (DLD)
8,971 units in finished projects; 6,200 units in active projects (unit-weighted progress about 29%) Dubai Land Department — Project Status
Jebel Ali Village handover
Handover of 892 homes began 17 Aug 2026 in an 80-hectare community for about 5,500 residents Nakheel — Jebel Ali Village handover press release (17 Aug 2026)

Figures & charts

Registered projects 63 DLD, 2026-11-23 · Dubai Land Department — Project Status
Units 15,171 DLD, 2026-11-23 · Dubai Land Department — Project Status
Registered projects by status
Completed
28
Under construction
35
Cancelled
6

As registered with the Dubai Land Department.

Show as a table
StatusProjects
Completed28
Under construction35
Cancelled6
Units by completion year
751
2013
210
2014
531
2015
1,932
2016
450
2021
1,625
2024
898
2025
1,368
2026
1,305
2027
1,958
2028
212
2029
795
2030

Highlighted years are still to come: planned completion dates, which can move.

Show as a table
YearUnits
2013751
2014210
2015531
20161,932
2021450
20241,625
2025898
20261,368
20271,305
20281,958
2029212
2030795
Where they build
Palm Jabal Ali
23
Jabal Ali First
12
Palm Jumeirah
11
Palm Deira
8
Al Thanyah Fifth
5
Al Warsan First
4

Registered projects per DLD area, top 10.

Show as a table
AreaProjects
Palm Jabal Ali23
Jabal Ali First12
Palm Jumeirah11
Palm Deira8
Al Thanyah Fifth5
Al Warsan First4

Registered projects (DLD)

Every project the Dubai Land Department lists under this developer, with its status, units and construction progress as registered.

Project Status Progress Units Completion Area
Palm Central Private Residences - Frond N #4426 Under construction 0% 222 Dec 2030 Palm Jabal Ali
Palm Central Private Residences - Frond D #4613 Under construction 0% 216 Oct 2030 Palm Jabal Ali
Bay Estate #4553 Under construction 0% 357 Aug 2030 Palm Deira
Palm Central Private Residences - Frond M #4156 Under construction 0% 212 Jul 2029 Palm Jabal Ali
Palm Jebel Ali - The Beach And Coral Collection - Frond C #4103 Under construction 3% 44 Dec 2028 Palm Jabal Ali
Palm Jebel Ali - The Beach And Coral Collection - Frond D #4107 Under construction 2% 44 Dec 2028 Palm Jabal Ali
Palm Jebel Ali - The Beach And Coral Collection #4091 Under construction 2% 44 Dec 2028 Palm Jabal Ali
Palm Jebel Ali - The Beach And Coral Collection - Frond B #4101 Under construction 3% 44 Dec 2028 Palm Jabal Ali
Palm Jebel Ali - The Beach And Coral Collection - Frond F #4128 Under construction 3% 44 Dec 2028 Palm Jabal Ali
Palm Jebel Ali - The Beach And Coral Collection - Frond E #4113 Under construction 3% 40 Dec 2028 Palm Jabal Ali
Bay Grove Residences B - Dubai Islands #3631 Under construction 8% 241 Sep 2028 Palm Deira
Bay Grove Residences D - Dubai Islands #3785 Under construction 4% 257 Sep 2028 Palm Deira
Bay Grove Residences C - Dubai Islands #3415 Under construction 7% 360 Apr 2028 Palm Deira
Bay Grove Residences, Dubai Islands #3293 Under construction 12% 296 Mar 2028 Palm Deira
Palm Jebel Ali - Frond E #3352 Under construction 9% 110 Jan 2028 Palm Jabal Ali
Palm Jebel Ali - Frond A #3331 Under construction 11% 60 Jan 2028 Palm Jabal Ali
Palm Jebel Ali - Frond C #3353 Under construction 9% 100 Jan 2028 Palm Jabal Ali
Palm Jebel Ali - Frond D #3395 Under construction 9% 116 Jan 2028 Palm Jabal Ali
Palm Jebel Ali - Frond B #3347 Under construction 10% 78 Jan 2028 Palm Jabal Ali
Palm Jebel Ali - Frond F #3354 Under construction 12% 80 Jan 2028 Palm Jabal Ali
Palm Jebel Ali - Frond K #2596 Under construction 58% 114 Dec 2027 Palm Jabal Ali
Palm Jebel Ali - Frond N #2593 Under construction 58% 130 Oct 2027 Palm Jabal Ali
Palm Jebel Ali - Frond M #2594 Under construction 51% 146 Oct 2027 Palm Jabal Ali
Palm Jebel Ali - Frond P #2590 Under construction 49% 90 Sep 2027 Palm Jabal Ali
Palm Jebel Ali - Frond O #2592 Under construction 68% 108 Sep 2027 Palm Jabal Ali
Bay Villas - Dubai Islands #2899 Under construction 23% 636 May 2027 Palm Deira
Como Residences #2565 Under construction 25% 81 Mar 2027 Palm Jumeirah
Palm Beach Towers -3 #2449 Under construction 74% 460 Dec 2026 Palm Jumeirah
Palm Beach Towers - 2 #2429 Under construction 82% 321 Dec 2026 Palm Jumeirah
Palm Beach Towers -1 #2406 Under construction 83% 285 Dec 2026 Palm Jumeirah
Bay Residences Dubai Islands #2719 Under construction 48% 302 Oct 2026 Palm Deira
Palm Jebel Ali - Frond J #2597 Under construction 0% 67 Palm Jabal Ali
Palm Jebel Ali - Frond I #2598 Under construction 0% 21 Palm Jabal Ali
Palm Jebel Ali - Frond L #2595 Under construction 56% 140 Palm Jabal Ali
Beach Residences Dubai Islands #2811 Under construction 29% 334 Palm Deira
Jebel Ali Village Townhouses - Phase 3 #2387 Completed 100% 198 Dec 2025 Jabal Ali First
Jebel Ali Village Townhouses- Phase 1 #2375 Completed 100% 286 Dec 2025 Jabal Ali First
Jebel Ali Village Townhouses - Phase 2 #2384 Completed 100% 133 Dec 2025 Jabal Ali First
Jebel Ali Village #2285 Completed 100% 281 Dec 2025 Jabal Ali First
Tilal Al Furjan- Phase One #2338 Completed 100% 236 Dec 2024 Jabal Ali First
Tilal Al Furjan- Phase Two #2337 Completed 100% 247 Dec 2024 Jabal Ali First
Murooj Al Furjan 1 #2261 Completed 100% 267 Sep 2024 Jabal Ali First
Murooj Al Furjan 2 #2262 Completed 100% 351 Sep 2024 Jabal Ali First
Murooj Alfurjan West #2273 Completed 100% 524 Sep 2024 Jabal Ali First
The Palm Tower #1603 Completed 100% 450 Nov 2021 Palm Jumeirah
Alfurjan Package 6 #1661 Completed 100% 151 Sep 2016 Jabal Ali First
Alfurjan Package 4 #1686 Completed 100% 244 Aug 2016 Jabal Ali First
Warsan Village - D #1386 Completed 100% 208 Jun 2016 Al Warsan First
Warsan Village - B & C #1385 Completed 100% 360 Jun 2016 Al Warsan First
Warsan Village A #1384 Completed 100% 369 Jun 2016 Al Warsan First
Azure Residence #1350 Completed 100% 179 May 2016 Palm Jumeirah
Jumeirah Park 7a #1369 Completed 100% 227 Apr 2016 Al Thanyah Fifth
Jumeirah Park 7b&C #1368 Completed 100% 194 Feb 2016 Al Thanyah Fifth
Club Vista Mare #1351 Completed 100% 43 Dec 2015 Palm Jumeirah
Jumeirah Park Package 1a #1485 Completed 100% 248 Sep 2015 Al Thanyah Fifth
Palma Residence #1314 Completed 100% 105 May 2015 Palm Jumeirah
Jumeirah Park - Package 5a #1332 Completed 100% 135 Feb 2015 Al Thanyah Fifth
Palm Views - West #1317 Completed 100% 104 Nov 2014 Palm Jumeirah
Palm Views - East #1316 Completed 100% 105 Mar 2014 Palm Jumeirah
Jumeirah Park #1282 Completed 100% 1 Feb 2014 Al Thanyah Fifth
Al Furjan #1283 Completed 100% 751 May 2013 Jabal Ali First
International City Emarati #1288 Completed 100% 1,594 Jan 2012 Al Warsan First
Marina Residence #1297 Completed 100% 980 Jun 2009 Palm Jumeirah
Dragon Towers #2063 Cancelled 17% 1 Feb 2021 Al Warsan First
Jumeirah Park Villas #2005 Cancelled 0% 1 Dec 2020 Al Thanyah Fifth
The Palm Jumeirah Trump Marina Res & Trump Plaza #1281 Cancelled 0% 1 Dec 2012 Palm Jumeirah
The Palm Jebel Ali Water Homes #1164 Cancelled 12% 1 Mar 2012 Palm Jabal Ali
The Palm Jebel Ali Fronds #1286 Cancelled 4% 1 Jul 2011 Palm Jabal Ali
International City Forbidden City #1289 Cancelled 0% 1 Al Warsan First

Source: Dubai Land Department — Project Status · 23 Nov 2026

Projects by Nakheel on Mr Amlak

Residential

Bay Estate

Nakheel Dubai Islands
Progress 0%
Started
Oct 2026
Expected
Aug 2030
Units
357
Starting price
Needs verification
Residential · Hotel · Commercial

Palm Jebel Ali

Nakheel Palm Jebel Ali
Progress Needs verification
Started
Oct 2002
Expected
Dec 2030
Units
2,054
Starting price
Needs verification

Communities

Photos & videos

Discover Palm Jebel Ali. An island crafted to inspire.

Nakheel Official Watch on YouTube

Awards & more

Landmarks 6

  • Palm Jumeirah Palm-shaped island collection; towers and residences such as The Palm Tower, Palm Views, Club Vista Mare, Como Residences and Palm Beach Towers
  • Palm Jebel Ali Relaunched mega-island about twice the size of Palm Jumeirah, with villa fronds, Palm Central apartments and beach collections
  • Dubai Islands Former Deira Islands; five-island waterfront destination with Bay Villas, Bay Grove Residences and Rixos hotel residences
  • Al Furjan Gated villa and apartment community (Murooj Al Furjan, Tilal Al Furjan, Masakin Al Furjan) with 8 projects registered at DLD
  • International City Affordable apartment community; Warsan Village phases A–D registered at DLD
  • Jumeirah Park Villa community with several packages registered as finished at DLD

Source: Nakheel — Palm Jumeirah page

Our analysis

Strengths

It has a real delivery record: 28 finished DLD projects (about 44% of projects and 59% of registered units), including Al Furjan, Jumeirah Park, International City and Jebel Ali Village, where the handover of 892 homes began on 17 August 2026. Being part of Dubai Holding also gives it a clear institutional backing.

Based on: DLD Project Status, 8 Nakheel legal entities, 23 Nov 2026: 63 registered projects (28 finished, 35 active, 6 cancelled); Nakheel site

Weaknesses

The active pipeline is concentrated in a few waterfront mega-projects and much of it is early-stage: unit-weighted progress of active projects is about 29%, and several (such as Bay Estate and some Palm Central phases) show 0% at DLD. No public financial statements for Nakheel were found among the sources checked, so financial strength cannot be measured with figures.

Based on: DLD Project Status, 8 Nakheel legal entities, 23 Nov 2026: 63 registered projects (28 finished, 35 active, 6 cancelled); Nakheel site

Opportunities

The March 2024 incorporation of Nakheel and Meydan into Dubai Holding and the relaunch of Palm Jebel Ali and Dubai Islands show a developer with land and a long-term programme. For buyers, phases under construction with published DLD progress can be compared directly with finished projects in the same area.

Based on: DLD Project Status, 8 Nakheel legal entities, 23 Nov 2026: 63 registered projects (28 finished, 35 active, 6 cancelled); Nakheel site

Risks

Active projects carry registered completion dates from 2026 to 2030, and Palm Jebel Ali itself was paused in 2008 and relaunched in 2023, so buyers take on the timing risk of multi-year mega-projects. DLD dates are planned completions, not guaranteed handovers. Before buying, check the project's latest progress and escrow status on DLD/Mashrooi.

Based on: DLD Project Status, 8 Nakheel legal entities, 23 Nov 2026: 63 registered projects (28 finished, 35 active, 6 cancelled); Nakheel site

Market

Nakheel's registered projects are spread across several areas: Palm Jebel Ali (25 projects), Jabal Ali First (12, covering Al Furjan and Jebel Ali Village), Palm Jumeirah (12), Palm Deira / Dubai Islands (8), Al Warsan First (6) and Al Thanyah Fifth (6, Jumeirah Park). The range runs from luxury beachfront villas to affordable apartments, but the current launches lean luxury and waterfront.

Based on: DLD Project Status, 8 Nakheel legal entities, 23 Nov 2026: 63 registered projects (28 finished, 35 active, 6 cancelled); Nakheel site

Who it suits

Suited to buyers who prefer large, well-known projects and can wait several years: families wanting a finished home in Al Furjan or Jumeirah Park, or luxury buyers on Palm Jumeirah and Palm Jebel Ali. Someone who needs a near and certain handover should look only at projects with high progress or finished stock.

Based on: DLD Project Status, 8 Nakheel legal entities, 23 Nov 2026: 63 registered projects (28 finished, 35 active, 6 cancelled); Nakheel site

Buyer tips

Before any purchase, find the project in DLD Project Status and compare the progress percentage, registered completion date and status with your contract. Nakheel registers under several legal names (such as The Palm - Jumeirah Co. and Dubai Islands L.L.C), so searching for "Nakheel" alone does not show every project. This page makes no promise of profit or price growth.

Based on: DLD Project Status, 8 Nakheel legal entities, 23 Nov 2026: 63 registered projects (28 finished, 35 active, 6 cancelled); Nakheel site

Conclusion

Nakheel is one of Dubai's largest master developers, best known for Palm Jumeirah. DLD lists 63 projects under its eight legal entities: 28 finished (8,971 units) and 35 active (6,200 units). Most of the current pipeline sits on Palm Jebel Ali, Dubai Islands and Palm Jumeirah.

Sources

Photo credits
  • Aerial view of Palm Jumeirah · © Nakheel · Developer marketing material · Source page
  • Palm Jumeirah and the Dubai skyline · © Nakheel · Developer marketing material · Source page
  • The World islands off the Dubai coast · © Nakheel · Developer marketing material · Source page
  • Palm Jebel Ali, render of the island · © Nakheel · Developer marketing material · Source page
  • Dubai Islands waterfront, render · © Nakheel · Developer marketing material · Source page
  • Palm Jebel Ali villa community, render · © Nakheel · Developer marketing material · Source page

Figures come from the sources above, each with its date. Our analysis is Mr Amlak's reading of them, not advice and not a view of the Dubai Land Department.

Last reviewed: 23 Nov 2026

Book a visit

Choose a day and time that suits you and leave your details; our advisor will call to confirm the visit. Developer Nakheel

1 Day of the visit
2 Time Dubai time

Pick a day first.

3 Your details

Request a consultation All developers