Mr Amlak Preparing your property workspace...
Mr Amlak

Palm Jebel Ali

Nakheel

Palm Jebel Ali

Watch video

Aerial photograph of Palm Jebel Ali taken on 8 May 2008 during the original reclamation phase, before work stopped. It is not a rendering and does not show the current state. Photo: Imre Solt / Wikimedia Commons, CC BY-SA 3.0 (resized)

Units
2,054
Status
Under Construction
Project
DP-0006

Overview

Palm Jebel Ali is a master development by Nakheel (a Dubai Holding company) on reclaimed land off Dubai's Jebel Ali coast. Construction first began in 2002 and stopped around 2008; the plan was relaunched on 31 May 2023. Nakheel describes it as seven islands with 16 fronds and more than 90 km of beachfront. Villa construction contracts were awarded in October 2024 (723 villas on Fronds K to P) and April 2026 (544 villas on Fronds A to F, worth over AED 3.5 billion). In August 2026 Nakheel said the Frond K to P villas were in internal and external finishing, with the first handovers scheduled to start in late 2026 and run through 2027.

Sources do not agree on the island's size (13.4 square kilometres in 2023 reporting, 13.4 km of land in Nakheel's 2024 release, 'twice' or 'roughly three times' Palm Jumeirah in different articles), on coastline (110 km versus 120 km) or on the number of Frond K to P villas (723 versus 728). No source read states a completion date for the whole development; stated targets are per phase (Q4 2028 for the Frond A to F villas, September 2030 for the Palm Central apartments and townhouses). Villa launch prices were not published in the developer releases read; an analyst quote and a portal listing give different figures.

Timeline

  1. Palm Central 222 homes scheduled for completion Planned The National
  2. Fronds A to F villas (544) scheduled for completion Planned Developer website
  3. Frond K planned completion (December 2027) Planned fam Properties
  4. First properties to be delivered (Wikipedia: Q1 2027) Planned Wikipedia
  5. Infrastructure contracts scheduled for completion Planned Developer website
  6. First villa handovers scheduled to start (Fronds K to P), continuing through 2027 Planned Khaleej Times
  7. 44 more villas released on Frond F Developer website
  8. DLD inspection: Frond K about 47.9 percent complete fam Properties
  9. 222 Palm Central homes launched for sale The National
  10. Nakheel says villa delivery is under way and handovers will be phased, not on one date Developer website
  11. Contracts over AED 3.5 billion awarded for 544 villas on Fronds A to F (Ginco, UNEC) Developer website
  12. Nakheel aerial footage shows villa shells along the shoreline on several fronds What's On
  13. Beach Collection and Coral Collection villas unveiled (11 styles) Developer website
  14. DLD inspection: Frond O (108 villas) about 22 percent complete The National
  15. Infrastructure contracts over AED 750 million awarded to DBB Contracting (Fronds A to G, Spine District) Developer website
  16. First eight fronds expected to be site-ready Planned Khaleej Times
  17. Villa contracts worth over AED 5 billion awarded for 723 villas on Fronds K to P (Ginco, Shapoorji Pallonji Mideast, UNEC) Gulf News
  18. DEWA and Nakheel agree two substations on the island (AED 270 million) Dubai Holding
  19. AED 810 million marine works contract awarded to Jan De Nul Dredging Gulf Construction
  20. Infrastructure contracts awarded: DBB Contracting (access and construction roads) and Khansaheb (Al Hesah Street) Developer website
  21. Sheikh Mohammed approves the new master plan The National
  22. Court judgment reportedly cancels the old project's contracts (724 villa contracts voided) Wikipedia
  23. Work halted after the financial crisis Wikipedia
  24. Breakwater completed Wikipedia
  25. Original construction begins Wikipedia
Project type
Residential · Hotel · Commercial
1 source
  • Villas, apartments and townhouses; retail centre of 9,000 sqm leasable space; Friday Mosque; plans for 80 hotels and resorts · Developer website
Construction status
Under Construction
Sources differ
  • Fronds A to F: 544 villas in substructure, superstructure, MEP and infrastructure works; Fronds K to P: 728 villas in internal and external finishing · Developer website
  • 544 villas under construction across Fronds A to F; 728 villas on Fronds K to P at internal and external finishing · Khaleej Times
  • Under Construction (DLD status Active for all 22 Palm Jebel Ali projects) · Dubai Land Department — Project Status
Progress
Not stated
Construction start
Oct 2002
Sources differ
  • October 2002: construction began · Wikipedia
  • Infrastructure contracts for the relaunched project awarded 26 May 2024 (6 km public access road, construction road) · Developer website
Expected completion
Dec 2030
Sources differ
Actual handover
Not stated
DLD project number
Not stated
DLD registration date
Not stated
Project ID
DP-0006

Videos

Published by the channels named below. A video starts loading only when you press play.

Palm Jebel Ali | Q1 2026 Construction Progress

Nakheel Official Official Watch on YouTube

Palm Jebel Ali | Q4 2025 Construction Progress Update

Nakheel Official Official Watch on YouTube

Palm Jebel Ali – Q3 2025 Construction Progress Update

Nakheel Official Official Watch on YouTube

Palm Jebel Ali | August 2026 Construction Progress

Nakheel Official Official Watch on YouTube

Palm Jebel Ali Development Update | February 2025

Nakheel Official Official Watch on YouTube

Building and units

Height
Not stated
Floors
Not stated
Blocks
Not stated
Total units
2,054
Sources differ
  • 723 villas on Fronds K to P (539 Beach Collection, 184 Coral Collection) · Gulf News
  • 728 villas on Fronds K to P · Developer website
  • 544 villas on Fronds A to F (354 + 190) · Developer website
  • 222 homes (apartments and townhouses) in three buildings at Palm Central · The National
  • 2,054 units registered so far (22 DLD projects: Fronds A to F 544 villas, Fronds I and J 88 units, Fronds K to P 728 villas, Beach and Coral Collection 260 villas, Palm Central 434 homes) · Dubai Land Department — Project Status
Parking spaces
Not stated
Developer
Nakheel
Sources differ
Consultant
Villa designs by NAGA, LOCI, WATG, LW Design, SAOTA and Whitespace; Friday Mosque by SOM
Sources differ
  • Villa designs by NAGA Architects, LOCI, WATG, LW Design Group, SAOTA (Beach Collection); SAOTA, LOCI, LW Design Group, NAGA Architects (Coral Collection); Friday Mosque designed by SOM · Developer website
  • Villa designs by NAGA, LOCI, WATG, LW Design, SAOTA and Whitespace; Friday Mosque by SOM · Developer website
Main contractor
Several by scope: Jan De Nul (marine), DBB Contracting (roads), Ginco, UNEC and Shapoorji Pallonji (villas)
Sources differ
  • Jan De Nul Dredging: AED 810 million marine works (dredging, reclamation, beach profiling, sand placement) · Gulf Construction
  • DBB Contracting LLC (Dutco Group): public access road from Sheikh Zayed Road and a construction road for the central Palm; Khansaheb Civil Engineering: Al Hesah Street upgrade · Developer website
  • DBB Contracting LLC: three infrastructure contracts totalling over AED 750 million (Fronds A to G, Spine District, DEWA line grading), completion Q4 2026 · Developer website
  • Ginco General Contracting (197 villas, Fronds O and P), Shapoorji Pallonji Mideast (275 villas, Fronds M and N), UNEC (251 villas, Fronds K and L); over AED 5 billion in total · Gulf News
  • Ginco General Contracting (354 villas, Fronds A to D), UNEC (190 villas, Fronds E and F); over AED 3.5 billion in total · Developer website
Units by type
Fronds A to F, 6 bedroom villas (DLD register)
291
Fronds K to P, 5 bedroom villas (DLD register)
278
Fronds K to P, 6 bedroom villas (DLD register)
266
Fronds A to F, 5 bedroom villas (DLD register)
253
Palm Central Private Residences, Frond N, 1 to 5 bedrooms (DLD register)
222
Palm Central Private Residences, Frond M, 1 to 5 bedrooms (DLD register)
212

As counted by Dubai Land Department — Project Status: 1,522 units. Sources count differently, so their totals are never added together.

Unit types and sizes

Each row keeps its own source. The bar shows where the size range sits among this project's units.

Type Units Size Source
Beach Collection villa, 5 to 6 bedrooms (544 villas on Fronds K to P) 544 7,500 – 8,500 sq ft Developer website Data to 23 Oct 2025
Coral Collection villa, 6 to 7 bedrooms (184 villas on Fronds K to P) 184 11,500 – 12,500 sq ft Developer website Data to 23 Oct 2025
Villas at award, Fronds K to P (built-up area range for all) 723 8,000 – 15,000 sq ft The National Data to 16 Oct 2024
Frond F release: 44 villas, Beach and Coral Collections, 5 to 7 bedrooms 44 7,500 – 12,500 sq ft Developer website Data to 20 Aug 2026
Palm Central apartments, 1 to 4 bedrooms Not stated Not stated The National Data to 24 Jun 2026
Palm Central townhouses, 4 to 5 bedrooms Not stated Not stated The National Data to 24 Jun 2026
Retail centre, 9,000 sqm leasable space (planned) 1 Not stated Developer website Data to 23 Oct 2025
Beach Collection 5 bedroom villa (portal listing) Not stated 7,882 – 8,434 sq ft Property Finder
Beach Collection 6 bedroom villa (portal listing) Not stated 7,316 – 7,875 sq ft Property Finder
Coral Collection 7 bedroom villa (portal listing) Not stated 11,222 – 12,165 sq ft Property Finder
Palm Central 1 bedroom apartment (one registered sale) Not stated 840 sq ft Property Finder Data to 26 Oct 2026
Palm Central 4 bedroom apartment (one registered sale) Not stated 3,251 sq ft Property Finder Data to 26 Oct 2026
Fronds K to P, 5 bedroom villas (DLD register) 278 Not stated Dubai Land Department — Project Status Data to 7 Nov 2026
Fronds K to P, 6 bedroom villas (DLD register) 266 Not stated Dubai Land Department — Project Status Data to 7 Nov 2026
Fronds A to F, 5 bedroom villas (DLD register) 253 Not stated Dubai Land Department — Project Status Data to 7 Nov 2026
Fronds A to F, 6 bedroom villas (DLD register) 291 Not stated Dubai Land Department — Project Status Data to 7 Nov 2026
Palm Central Private Residences, Frond N, 1 to 5 bedrooms (DLD register) 222 Not stated Dubai Land Department — Project Status Data to 7 Nov 2026
Palm Central Private Residences, Frond M, 1 to 5 bedrooms (DLD register) 212 Not stated Dubai Land Department — Project Status Data to 7 Nov 2026

Payment plans

As quoted by each source. They don't always agree, so each one is shown on its own. Get the plan for your unit in writing from the developer.

  • Down payment (at sales launch)20%
  • During construction60%
  • On handover20%

In the building

Worth knowing

Development area
10.5 million sq m Developer website
Island size (another source)
13.4 sq km The National
Coastline
110 km Developer website
Coastline (later release)
120 km Dubai Holding
Beachfront
91 km Developer website
Planned residents (families)
About 35,000 families Developer website
Planned residents (people, earlier plan)
More than 250,000 people Wikipedia
DLD project number (Frond K only)
2596 fam Properties
Frond O progress
21.9% (Oct 2025) The National
Frond K progress
47.91% (Aug 2026) fam Properties
Frond A (DLD 3331)
60 villas (30 5-bed, 30 6-bed), 11.08% built, completion due 17 January 2028 Dubai Land Department — Project Status
Frond B (DLD 3347)
78 villas (38 5-bed, 40 6-bed), 10% built, completion due 17 January 2028 Dubai Land Department — Project Status
Frond C (DLD 3353)
100 villas (48 5-bed, 52 6-bed), 8.58% built, completion due 17 January 2028 Dubai Land Department — Project Status
Frond D (DLD 3395)
116 villas (53 5-bed, 63 6-bed), 8.73% built, completion due 17 January 2028 Dubai Land Department — Project Status
Frond E (DLD 3352)
110 villas (51 5-bed, 59 6-bed), 9.21% built, completion due 17 January 2028 Dubai Land Department — Project Status
Frond F (DLD 3354)
80 villas (33 5-bed, 47 6-bed), 11.82% built, completion due 17 January 2028 Dubai Land Department — Project Status
Frond I (DLD 2598)
21 villas (20 7-bed, 1 other), 0% built Dubai Land Department — Project Status
Frond J (DLD 2597)
67 villas (18 5-bed, 13 6-bed, 36 7-bed), 0% built Dubai Land Department — Project Status
Frond K (DLD 2596)
114 villas (41 5-bed, 39 6-bed, 34 7-bed), 47.91% built, completion due 1 December 2027 Dubai Land Department — Project Status
Frond L (DLD 2595)
140 villas (58 5-bed, 52 6-bed, 30 7-bed), 42.65% built Dubai Land Department — Project Status
Frond M (DLD 2594)
146 villas (58 5-bed, 58 6-bed, 30 7-bed), 40.29% built, completion due 8 October 2027 Dubai Land Department — Project Status
Frond N (DLD 2593)
130 villas (51 5-bed, 49 6-bed, 30 7-bed), 47.1% built, completion due 8 October 2027 Dubai Land Department — Project Status
Frond O (DLD 2592)
108 villas (39 5-bed, 39 6-bed, 30 7-bed), 55.7% built, completion due 29 September 2027 Dubai Land Department — Project Status
Frond P (DLD 2590)
90 villas (31 5-bed, 29 6-bed, 30 7-bed), 34.65% built, completion due 29 September 2027 Dubai Land Department — Project Status
The Beach and Coral Collection (DLD 4091)
44 villas (10 5-bed, 28 6-bed, 6 7-bed), 2.41% built, completion due 4 December 2028 Dubai Land Department — Project Status
The Beach and Coral Collection - Frond B (DLD 4101)
44 villas (8 5-bed, 30 6-bed, 6 7-bed), 2.68% built, completion due 4 December 2028 Dubai Land Department — Project Status
The Beach and Coral Collection - Frond C (DLD 4103)
44 villas (9 5-bed, 29 6-bed, 6 7-bed), 2.77% built, completion due 4 December 2028 Dubai Land Department — Project Status
The Beach and Coral Collection - Frond D (DLD 4107)
44 villas (8 5-bed, 30 6-bed, 6 7-bed), 2.21% built, completion due 4 December 2028 Dubai Land Department — Project Status
The Beach and Coral Collection - Frond E (DLD 4113)
40 villas (6 5-bed, 24 6-bed, 10 7-bed), 2.6% built, completion due 4 December 2028 Dubai Land Department — Project Status
The Beach and Coral Collection - Frond F (DLD 4128)
44 villas (5 5-bed, 25 6-bed, 14 7-bed), 2.51% built, completion due 4 December 2028 Dubai Land Department — Project Status
Palm Central, Frond N (DLD 4426)
222 homes (90 1-bed, 74 2-bed, 38 3-bed, 18 4-bed, 2 5-bed), 0% built, completion due 13 December 2030 Dubai Land Department — Project Status
Palm Central, Frond M (DLD 4156)
212 homes (72 1-bed, 72 2-bed, 48 3-bed, 16 4-bed, 4 5-bed), 0.08% built, completion due 31 July 2029 Dubai Land Department — Project Status

Prices and rents

Recorded sales

Figures sources attribute to recorded deals. Not checked against DLD yet.

Figure Value Property type Period Source
Average sale price AED 16,352,649All registered sales, 'last year' filter Residential Last year to 5 Nov 2026 (exact window not stated) Property Finder Data to 5 Nov 2026
Median sale price Not stated
Median price per sq ft Not stated
Lowest recorded price AED 20,000,000 Residential Date not given (quoted Aug 2024) The National
Highest recorded price AED 50,000,000 Residential Date not given (quoted Aug 2024) The National
Number of sales 711Registered sales, 'last year' filter Residential Last year to 5 Nov 2026 (exact window not stated) Property Finder Data to 5 Nov 2026
Number of sales: Also reported 22Homes above USD 10 million sold, Q4 2025 (Knight Frank) Residential Oct 2025 – Dec 2025 The National Data to 12 Jan 2026
Total sales volume Not stated
Price change over one year Not stated
Price change over several years Not stated
Estimated price per sq ft (source's model, not a deal) AED 3,406 / sq ftAverage price per sq ft, 'last year' filter Residential Last year to 5 Nov 2026 (exact window not stated) Property Finder Data to 5 Nov 2026
Estimated price per sq ft (source's model, not a deal): Also reported AED 2,578 / sq ft Residential Oct 2023 – Dec 2023 The National
Estimated price per sq ft (source's model, not a deal): Also reported AED 2,717 / sq ft Residential Jan 2024 – Mar 2024 The National
Estimated price per sq ft (source's model, not a deal): Also reported AED 2,794 / sq ft Residential Apr 2024 – Jun 2024 The National

Asking prices

What sellers ask in adverts. Kept apart from deals because an asking price is not a sale.

Figure Value Property type Period Source
Developer's starting price AED 2,700,000Palm Central 1 bedroom Residential Palm Central launch, June 2026 (1-bedroom) The National
Developer's starting price: Also reported AED 30,535,0005 bedroom Beach Collection villa, Frond E (launch pricing seen Oct 2026) Residential Oct 2026 Aigents Realty Data to 1 Oct 2026
Developer's starting price: Also reported AED 30,900,0006 bedroom villa, Frond E (Oct 2026) Residential Oct 2026 Aigents Realty Data to 1 Oct 2026
Developer's starting price: Also reported AED 49,100,0007 bedroom Coral Collection villa, Frond E (Oct 2026) Residential Oct 2026 Aigents Realty Data to 1 Oct 2026
Developer's starting price: Also reported AED 18,000,000Palm Jebel Ali villa, launch price Residential Launch price, date not given Property Finder
Developer's starting price: Also reported AED 4,300,000Palm Central 2 bedroom Residential Palm Central launch, June 2026 (2-bedroom) The National
Developer's starting price: Also reported AED 7,500,000Palm Central 3 bedroom Residential Palm Central launch, June 2026 (3-bedroom) The National
Developer's starting price: Also reported AED 12,400,000Palm Central 4 bedroom Residential Palm Central launch, June 2026 (4-bedroom) The National
Developer's starting price: Also reported AED 14,900,000Palm Central townhouse Residential Palm Central launch, June 2026 (townhouse) The National
Developer's starting price: Also reported AED 19,000,000Beach Collection villa, launch price (header) Residential Launch price, date not given Property Finder
Developer's starting price: Also reported AED 18,600,000Beach Collection villa, launch price (FAQ) Residential Launch price, date not given Property Finder
Developer's starting price: Also reported AED 18,000,000Palm Jebel Ali villas (summary box) Residential Date not given Binayah
Median asking price per sq ft Not stated
Lowest asking price AED 18,500,000Resale villas on Bayut guide (6 bedroom, Frond C) Residential Sep 2026 Bayut Data to 29 Sep 2026
Highest asking price AED 31,000,000Resale villas on Bayut guide (7 bedroom, Frond N) Residential Sep 2026 Bayut Data to 29 Sep 2026

Rents

Figure Value Property type Period Source
Annual rent Not stated
Annual rent per sq ft Not stated
Number of rent contracts Not stated

Individual deals on record

Grants and mortgages are shown for context and are not counted as market prices.

DateDealAmountSizePer sq ftSource
5 Nov 2026 Sale AED 21,129,000 8,465 sq ft 2,496 Dubai Land Department — Open Data
2 Nov 2026 Sale AED 50,124,000 11,520 sq ft 4,351 Dubai Land Department — Open Data
29 Oct 2026 Sale AED 19,748,800 7,316 sq ft 2,699 Dubai Land Department — Open Data
26 Oct 2026 Sale AED 10,239,250 8,166 sq ft 1,254 Dubai Land Department — Open Data
26 Oct 2026 Sale AED 2,779,000 840 sq ft 3,310 Dubai Land Department — Open Data
26 Oct 2026 Sale AED 30,539,000 7,723 sq ft 3,954 Dubai Land Department — Open Data
26 Oct 2026 Sale AED 49,268,000 11,635 sq ft 4,234 Dubai Land Department — Open Data
26 Oct 2026 Sale AED 12,914,000 3,251 sq ft 3,973 Dubai Land Department — Open Data
26 Oct 2026 Sale AED 49,613,000 11,635 sq ft 4,264 Dubai Land Department — Open Data
26 Oct 2026 Sale AED 53,545,000 12,430 sq ft 4,308 Dubai Land Department — Open Data

Charts

Starting prices on record
Palm Central 1 bedroom The National · Palm Central launch, June 2026 (1-bedroom)
AED 2.7M
Palm Central 2 bedroom The National · Palm Central launch, June 2026 (2-bedroom)
AED 4.3M
Palm Central 3 bedroom The National · Palm Central launch, June 2026 (3-bedroom)
AED 7.5M
Palm Central 4 bedroom The National · Palm Central launch, June 2026 (4-bedroom)
AED 12.4M
Palm Central townhouse The National · Palm Central launch, June 2026 (townhouse)
AED 14.9M
Palm Jebel Ali villa, launch price Property Finder · Launch price, date not given
AED 18M
Palm Jebel Ali villas (summary box) Binayah · Date not given
AED 18M
Beach Collection villa, launch price (FAQ) Property Finder · Launch price, date not given
AED 18.6M
Beach Collection villa, launch price (header) Property Finder · Launch price, date not given
AED 19M
5 bedroom Beach Collection villa, Frond E (launch pricing seen Oct 2026) Aigents Realty · Oct 2026
AED 30.54M
6 bedroom villa, Frond E (Oct 2026) Aigents Realty · Oct 2026
AED 30.9M
7 bedroom Coral Collection villa, Frond E (Oct 2026) Aigents Realty · Oct 2026
AED 49.1M

Bars run from the lowest figure up. The darker bar is the one this page leads with. These are prices sources quote, not deals.

Show as a table
What it measuresValueSourcePeriod
Palm Central 1 bedroomAED 2.7MThe NationalPalm Central launch, June 2026 (1-bedroom)
Palm Central 2 bedroomAED 4.3MThe NationalPalm Central launch, June 2026 (2-bedroom)
Palm Central 3 bedroomAED 7.5MThe NationalPalm Central launch, June 2026 (3-bedroom)
Palm Central 4 bedroomAED 12.4MThe NationalPalm Central launch, June 2026 (4-bedroom)
Palm Central townhouseAED 14.9MThe NationalPalm Central launch, June 2026 (townhouse)
Palm Jebel Ali villa, launch priceAED 18MProperty FinderLaunch price, date not given
Palm Jebel Ali villas (summary box)AED 18MBinayahDate not given
Beach Collection villa, launch price (FAQ)AED 18.6MProperty FinderLaunch price, date not given
Beach Collection villa, launch price (header)AED 19MProperty FinderLaunch price, date not given
5 bedroom Beach Collection villa, Frond E (launch pricing seen Oct 2026)AED 30.54MAigents RealtyOct 2026
6 bedroom villa, Frond E (Oct 2026)AED 30.9MAigents RealtyOct 2026
7 bedroom Coral Collection villa, Frond E (Oct 2026)AED 49.1MAigents RealtyOct 2026
Every recorded sale: price per sq ft
1,0002,0003,0004,0005,000Oct 2026Nov 2026Nov 2026Median 3,9641,0002,0003,0004,0005,000Oct 2026Nov 2026Nov 2026Median 3,964

The grey line is the median of these 10 deals. Only 10 deals are on record here, against 711 reported. This is a sample, not a market trend.

Show as a table
DatePer sq ftAmountSize (sq ft)Source
26 Oct 2026AED 1,254 / sq ftAED 10,239,2508,166Dubai Land Department — Open Data
26 Oct 2026AED 3,310 / sq ftAED 2,779,000840Dubai Land Department — Open Data
26 Oct 2026AED 3,954 / sq ftAED 30,539,0007,723Dubai Land Department — Open Data
26 Oct 2026AED 4,234 / sq ftAED 49,268,00011,635Dubai Land Department — Open Data
26 Oct 2026AED 3,973 / sq ftAED 12,914,0003,251Dubai Land Department — Open Data
26 Oct 2026AED 4,264 / sq ftAED 49,613,00011,635Dubai Land Department — Open Data
26 Oct 2026AED 4,308 / sq ftAED 53,545,00012,430Dubai Land Department — Open Data
29 Oct 2026AED 2,699 / sq ftAED 19,748,8007,316Dubai Land Department — Open Data
2 Nov 2026AED 4,351 / sq ftAED 50,124,00011,520Dubai Land Department — Open Data
5 Nov 2026AED 2,496 / sq ftAED 21,129,0008,465Dubai Land Department — Open Data
Market in Palm Jebel Ali: price per sq ft by month
2,5003,0003,5004,0002,903Nov 2025Dec 2025Jan 2026Feb 20263,636Mar 20262,829Apr 20262,5003,0003,5004,0002,903Nov 2025Jan 20263,6362,829Apr 2026

The whole district, not this building. Source: Aigents Realty

Show as a table
MonthMedian AED / sq ft
Nov 2025AED 2,903 / sq ft
Dec 2025AED 3,496 / sq ft
Jan 2026AED 3,464 / sq ft
Feb 2026AED 3,459 / sq ft
Mar 2026AED 3,636 / sq ft
Apr 2026AED 2,829 / sq ft
Sales per month
024688Oct 20262Nov 2026024688Oct 20262Nov 2026

Months without a record are not shown, which does not mean no deals took place. Only 10 deals are on record here, against 711 reported. This is a sample, not a market trend.

Show as a table
MonthSales
Oct 20268
Nov 20262
Data we don't have yet (4)
  • Annual rent per sq ft, last 12 monthsNot enough dated rent contracts yet. The contracts on record start in the future or are too few to show a trend.
  • Price per sq ft against the areaNo source gives both this project and its area.
  • Rental yield against similar projectsNo similar project with rent and price figures is in the directory yet.
  • Construction progress over timeNo progress reports on record yet.

Investment analysis

Gross Rental Yield
Not stated
Net Rental Yield
Not stated
Payback Period
Not stated
Capital Appreciation
Not stated
Rental Yield reported by a source
Not stated
ROI
Not stated Depends on your resale price and holding period. Enter them in the calculator below.
Average monthly rent
Not stated
Service charge, yearly
Not stated
Maintenance, yearly
Not stated
Buying costs (assumed)
4% + AED 580 DLD transfer fee and title deed, from secondary sources. Agent and trustee fees are not included.

Run your own numbers

Filled in from the leading figures above. Replace them with the real quote for your unit. Nothing you type is stored.

Total acquisition cost–
Gross yield–
Net yield–
Payback–
Monthly rent–
ROI over the holding period–

Location

Distances

Place Kind By road Straight line By car Source
Life Pharmacy metro Metro 19.6 km 11.3 km 23 min OpenStreetMap
Danube metro Metro 23.2 km 11.2 km 29 min OpenStreetMap
Downtown Dubai (Burj Khalifa) Downtown Dubai 51.8 km 35.8 km 47 min OpenStreetMap
Al Maktoum International Airport (DWC) Airport 29.0 km 21.8 km 39 min OpenStreetMap
Dubai International Airport (DXB) Airport 67.1 km 46.9 km 61 min OpenStreetMap
Ibn Battuta Mall Shopping 29.0 km 14.2 km 31 min OpenStreetMap
Dubai Outlet Village Shopping 25.9 km 11.1 km 32 min OpenStreetMap
Cedars Jebel Ali Hospital Hospital 27.7 km 10.3 km 32 min OpenStreetMap
Lifeline Hospital Hospital 29.1 km 13.2 km 32 min OpenStreetMap
The Winchester School School 28.0 km 14.0 km 30 min OpenStreetMap
Jebel Ali Primary School School 29.1 km 13.2 km 32 min OpenStreetMap

Around the project

Compared with other projects

Project Status Height Floors Units Progress Completion Price
Palm Jebel Ali Under Construction Not stated Not stated 2,054 Not stated Dec 2030 AED 2.7MStarting from
Soulever by Beyond Under Construction Not stated 44 517 0% Dec 2028 AED 2.53MStarting from
Maybach Ultimate Luxury Under Construction Not stated Not stated 1,233 18% Apr 2028 AED 1.16MStarting from
Pinewood Estate Homes Under Construction Not stated Not stated 247 0% Nov 2028 AED 5.6MStarting from

Every figure here is a research figure. Prices are the headline figure of each project, so they are not always the same kind of number: read the small line under each.

Expert analysis

Mr Amlak's reading of the sources listed on this page. It is not a rating or an opinion of the Dubai Land Department.

Strengths

The villa programme has named contractors, dated awards and a staged build: three contractors were awarded the 723-villa Frond K to P contracts in October 2024, and by August 2026 the developer reported those villas at internal and external finishing. Two further contractors hold the 544-villa Frond A to F contracts awarded in April 2026.

Based on: Gulf News 2024-10-16 (197 + 275 + 251 = 723 villas by contractor); Dubai Holding / Nakheel 2026-04-27 (354 + 190 = 544) and 2026-08-20 (status of Fronds A to F and K to P).

Weaknesses

Public data on prices is thin. Nakheel's villa releases state no price; the only villa figures are an analyst range of AED 20 million to 50 million (August 2024) and a portal launch price of AED 18 million with no data date. The two do not agree, and neither is a DLD record.

Based on: The National 2024-08-26 (AED 20 to 50 million); Property Finder Beach Collection page (AED 18 million launch price, no date); Nakheel 2025-10-23 and Dubai Holding 2026-08-20 releases (no price).

Investment opportunities

Infrastructure is being built ahead of the later fronds: DBB Contracting holds over AED 750 million of utilities and roads work on Fronds A to G and the Spine District, due Q4 2026, and the Jan De Nul marine contract covers reclamation and beach work. The plan also includes a 9,000 sqm retail centre and a Friday Mosque, which are not yet built.

Based on: Nakheel 2025-06-16 (AED 750 million, Q4 2026); Gulf Construction 2024-12-01 (AED 810 million, Jan De Nul); Nakheel 2025-10-23 (retail centre, mosque).

Investment risks

The project has already stopped once: work began in 2002, was halted around 2008, and in 2022 reports said a court judgment voided 724 earlier villa contracts, with refunds reported to original investors. Wikipedia also notes arbitration notices in 2024 from investors against Dubai Holding, including Nakheel. These are reported events, not a forecast; Wikipedia's summary of them was not checked against the underlying articles.

Based on: Wikipedia (2002 start, 2008 halt, 724 voided contracts, 2024 arbitration notices).

Delivery dates differ by source and by phase. Frond K to P villas were given as 'late 2026' at award, 'end of 2027' in a December 2024 trade report and 'late 2026 through 2027' in August 2026. The Frond A to F target is Q4 2028 and Palm Central is September 2030. A buyer should read these as developer targets, with no completion percentage published.

Based on: Gulf News 2024-10-16; Gulf Construction 2024-12-01; Khaleej Times 2026-08-20; Dubai Holding 2026-04-27; The National 2026-06-24.

Market reading

Analysts quoted by The National estimated nearly 700 villas were launched in 2023, with a per sq ft figure that rose from AED 2,578 in Q4 2023 to AED 2,794 at the end of Q2 2024 (about 8 percent over those quarters). The basis of that per sq ft figure is not stated, and the sales count is an estimate. The 2026 launches (222 Palm Central homes from AED 2.7 million, 44 Frond F villas) show Nakheel is still releasing stock in phases.

Based on: The National 2024-08-26 (nearly 700 villas; AED 2,578 / 2,717 / 2,794 per sq ft); The National 2026-06-24 (222 homes, from AED 2.7 million); Dubai Holding 2026-08-20 (44 villas). The 8 percent is Mr Amlak's arithmetic on the first and last figures, not the source's.

Conclusion

Palm Jebel Ali is a relaunched Nakheel master development with dated contract awards (over AED 13 billion in total per Nakheel, August 2026), two villa batches under construction and staged targets from late 2026 to September 2030. What is missing from public sources is a project-wide completion date, a completion percentage, any DLD transaction record and an official villa price list; island size and coastline are quoted differently across sources. This is Mr Amlak's reading of the listed sources, not a DLD rating.

Documents and official pages

Sources

Source Kind Items Latest data date Last checked
Dubai Land Department — Project Status Official 32 7 Nov 2026 7 Nov 2026
Dubai Land Department — Open Data Official 10 7 Nov 2026 7 Nov 2026
Developer website Developer 44 20 Aug 2026 7 Nov 2026
The National Reference 28 24 Jun 2026 7 Nov 2026
Property Finder Listings portal 14 5 Nov 2026 Not stated
Aigents Realty Market data 11 1 Oct 2026 Not stated
Wikipedia Reference 11 19 May 2022 7 Nov 2026
OpenStreetMap Reference 11 6 Nov 2026 Not stated
fam Properties Reference 5 5 Aug 2026 7 Nov 2026
Nakheel Official YouTube Developer 5 Not stated 7 Nov 2026
Dubai Holding Developer 4 20 Aug 2026 7 Nov 2026
Gulf News Reference 4 16 Oct 2024 Not stated
Khaleej Times Reference 4 20 Aug 2026 7 Nov 2026
Bayut Listings portal 2 29 Sep 2026 Not stated
Gulf Construction Reference 2 1 Aug 2024 Not stated
Binayah Listings portal 1 Not stated Not stated
What's On Reference 1 5 Nov 2025 Not stated

Photo credits

Photo Credit Licence Source
Aerial photograph of Palm Jebel Ali taken on 8 May 2008 during the original reclamation phase, before work stopped. It is not a rendering and does not show the current state. Imre Solt / Wikimedia Commons, CC BY-SA 3.0 (resized) Not stated Not stated
The Dubai coast with the palm islands from the International Space Station, 10 June 2025. NASA, public domain Public domain Source page
The Dubai coast with the palm islands from the International Space Station, 17 July 2026. NASA, public domain Public domain Source page
The World Islands, Palm Jumeirah and Palm Jebel Ali from the International Space Station, 29 May 2019, during the years work had stopped. NASA, public domain Public domain Source page
Palm Jebel Ali from an airplane window, February 2007, during the original reclamation. This does not show the current state. Alireza Shakernia, CC BY-SA 3.0 CC BY-SA 3.0 Source page
Palm Jebel Ali seen from the ground, July 2009, after work stopped. This does not show the current state. Nepenthes, CC BY-SA 3.0 CC BY-SA 3.0 Source page
Contact advisor